Line 10 (Chongqing Rail Transit)

Line 10
 10 
Sanyawan Station Line 10.jpg
Sanyawan Station platform
Overview
Native name重庆轨道交通10号线
TypeRapid transit
SystemChongqing Rail Transit
StatusOperational
LocaleChongqing, China
TerminiWangjiazhuang
Liyuchi
Stations19
Line number10
Operation
Opened28 December 2017; 2 years ago (2017-12-28)
Operator(s)Chongqing Rail Transit (Group) Co., Ltd.
Technical
Line length34 km (21 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8 12 in)
Electrification1500 V DC Overhead line
Operating speed120 km/h (75 mph) (Peak)
Route map

Lanhua Rd
Lanhua Road Depot
Left arrow (ACW) Loop line (CW) Right arrow
Nanhu
 Loop 
Wanshou Rd
Nanping
Bus interchange  3 
Nanbin Rd
Qixinggang
 1 
Auditorium
Zengjiayan
 2 
Liyuchi
 9 
Hongtudi
 6 
Longtousi Park
S Square of Chongqing
N Railway Station
Chongqing North Railway Station  Loop   3 
N Square of Chongqing
N Railway Station
Bus interchange  4 
Minxinjiayuan
Sanyawan
Shangwan Rd
 9 
Huanshan Park
Changhe
Zhujiawan Depot
Terminal 3 of
Jiangbei Airport
Jiangbei Airport
Terminal 2 of
Jiangbei Airport
Jiangbei Airport Bus interchange  3 
Yubei Square
Lushan
Central Park E
 9 
Central Park
Central Park W
 5 
Yuelai
 6I 
Wangjiazhuang Depot
Wangjiazhuang
 6I 

Line 10 of Chongqing Rail Transit is a rapid transit line that opened on 28 December 2017.[1]

Opening timeline[]

Segment Commencement Length Station(s) Name
Wangjiazhuang — Liyuchi 28 December 2017 33.7 km (20.94 mi) 18 Phase 1
S. Square of Chongqing N. Railway Station 28 December 2018 infill station 1

Stations (north to south)[]

Service
routes
Station
Station name Connections Distance
km
Location
E L English Chinese
10/27 Wangjiazhuang 王家庄  6I  Yubei
| 10/26 Yuelai 悦来  6I  2.04 2.04
| 10/25 Central Park West 中央公园西  5  2.71 4.75
| 10/24 Central Park 中央公园 1.09 5.84
| 10/23 Central Park East 中央公园东  9  0.82 6.66
| 10/22 Lushan 鹿山 1.64 8.30
| 10/21 Yubei Square 渝北广场 2.05 10.35
10/20 Terminal 2 of Jiangbei Airport 江北机场T2航站楼  3  Chongqing Jiangbei International Airport CKG 0.74 11.09
10/19 Terminal 3 of Jiangbei Airport 江北机场T3航站楼 Chongqing Jiangbei International Airport CKG 2.22 13.31
| 10/18 Changhe 长河 5.31 18.62
| 10/17 Huanshan Park 环山公园 1.85 20.47
| 10/16 Shangwanlu 上湾路  9  1.67 22.14
| 10/15 Sanyawan 三亚湾 2.74 24.88
| 10/14 Minxinjiayuan 民心佳园 2.08 26.96
10/13 N Square of Chongqing N Railway Station 重庆北站北广场  4   YW  Chongqing North railway station CUW 2.61 29.57
10/12 S Square of Chongqing N Railway Station 重庆北站南广场  3   Loop   YW  Chongqing North railway station CUW 0.60 30.17
| 10/11 Longtousi Park 龙头寺公园 0.87 31.04
10/10 Hongtudi 红土地  6  1.63 32.67 Jiangbei
10/09 Liyuchi 鲤鱼池  9  1.09 33.76

Phase II (Under construction)[]

Station
Station name Connections Distance
km
Location
English Chinese
10/08 Zengjiayan 曾家岩  2  Yuzhong
10/07 Auditorium 大礼堂
10/06 Qixinggang 七星岗  1 
10/05 Nanbinlu 南滨路 Nan'an
10/04 Nanping 南坪  3 
10/03 Wanshoulu 万寿路
10/02 Nanhu 南湖  Loop 
10/01 Lanhualu 兰花路

References[]

  1. ^ "重庆市主城形成多层次立体交通体系". May 16, 2017.